Strategic Safety Stock Allocation in an AssemblySupply Chain Network

The supply chain structure of an engine assembly line consists of several complex flows and
processes to satisfy the requirements for on time delivery of these products. The difficulty in managing
such systems is due to the fact that more than 1000 parts should be available on time in a
synchronized manner to start the assembly procedures and deliver the products on time. Due to the
supplier lead time variability, quality inspection related delays and other sources of uncertainty, the
adherence to a production plan is almost impossible. This results in delays in the production schedule
which may result in delays in the delivery of engines to the customer.The objective of this research
project is to improve on time delivery performance of the engine assembly line and develop new
inventory policies for the supply chain operations to accommodate the transition to the moving
assembly line while keeping the inventory investment at an acceptable level.

Faculty Supervisor:

Onur Kuzgunkaya

Student:

Partner:

Pratt & Whitney

Discipline:

Engineering

Sector:

Environmental Science and Technology

University:

Concordia University

Program:

Accelerate

Current openings

Find the perfect opportunity to put your academic skills and knowledge into practice!

Find Projects