Development of instruments and methods engineered to mitigate the impact of non-tissue specific background sources for intraoperative spontaneous Raman spectroscopy applications

The interns will develop novel technologies using laser light to interrogate molecular vibrations in biological tissue setting up the stage for the next generation of intraoperative imaging techniques used to guide surgical interventions, including the resection of tumours in prostate and ovarian surgery as well as in neurosurgery. The partner organisation (Optech) is an organisation […]

Read More
Stochastic analysis of infiltration facilities for storm water control

Infiltration facilities are an effective storm water management practice. The conventional continuous simulation models are widely used in the hydrologic analysis of infiltration facilities in practical engineering practices. However, these continuous simulation models are often time-consuming and data-demanding. The previously proposed analytical probabilistic models can also be used for analyzing hydrologic performance of infiltration facilities, […]

Read More
RBC-Toronto Quantum Key Distribution Network Development

The interns will develop a quantum communication network built on RBC’s optical fiber infrastructure and perform secure commercial transactions using quantum-generated secure keys in the integrated classical communication network. The quantum communication network will be based on the measurement-device-independent quantum key distribution technology, which is developed by Prof. Hoi-Kwong Lo’s and Prof. Li Qian’s groups […]

Read More
Experimental investigation of dowel laminated panels reinforced with steel threaded bars under weak axis bending

StructureCraft Ltd is a renowned Canadian company for its quality mass timber products and ability to fabricate complex design. The company proposed a new methodology for reinforcing dowel laminated timber panels while the performance is yet to be investigated experimentally. The proposed research here will investigate the performance of this methodology under experimental tests. Both […]

Read More
Biomechanical modelling of tissue stiffness following exposure to sub-concussive head trauma in collegiate athletes

In this project, we propose integrating well-known neuroimaging algorithms to model axonal integrity of the white matter over the course of a full season, in collegiate football players. Using these findings as a basis for further investigation, we intend to develop a novel imaging processing tool that will integrate information from different neuroimaging methods to […]

Read More
Additive Manufacturing Exploration

The project will involve making and designing reference parts, and then producing 3D scans of those parts and providing some measurement analysis. Documentation on collection and safety must be followed throughout. 3D printing is not only a very unique way of creating something, but it also gives its user a very wide range of design […]

Read More
Researching Subsea Equipment for Lab Testing and Plume Migration

The project will research software and models of plume migration for subsea oil and gas productions. Plume migration is important because when a leak takes place subsea it needs to set off a sensor, and to do that for point sensors, the product must come near the sensor. Knowing how oil will move under water […]

Read More
Étude comparative de points d’opérations sans charge sur une turbine hydraulique de moyenne chute à échelle prototype

Le projet réalisé dans le cadre de stages Mitacs vise à renforcer et augmenter les connaissances sur la dynamique de l’écoulement traversant les turbines hydrauliques de type Francis de moyenne chute lorsqu’elles sont opérées en régimes hors production (sans charge). Ces conditions d’opération de plus en plus fréquentes et faisant partie intégrante des régimes transitoires, […]

Read More
Conception d’un procédé pour évaluer l’effet des taux d’occupation dynamique sur la productivité des chantiers de construction

Les nouvelles technologies émergentes dans la construction, notamment celles liées au BIM et aux simulations 4D à 7D, créent une rupture dans les méthodes de gestion et entrainent des changements majeurs dans la manière de gérer, coordonner, modéliser et planifier les chantiers, de même que la communication des informations. Cependant, lors de la planification, les […]

Read More
Integration of planning and scheduling for an industrial-scale analytical services facility

The aim of this project is to develop a computer-based algorithm that will integrate a planning model with a scheduling model to improve operations management for analytical service facilities. An iterative decomposition algorithm that can provide optimal production scheduling sequences (in acceptable computational times) based on changes in the strategic planning decisions will be provided […]

Read More