Conception d’un procédé pour évaluer l’effet des taux d’occupation dynamique sur la productivité des chantiers de construction

Les nouvelles technologies émergentes dans la construction, notamment celles liées au BIM et aux simulations 4D à 7D, créent une rupture dans les méthodes de gestion et entrainent des changements majeurs dans la manière de gérer, coordonner, modéliser et planifier les chantiers, de même que la communication des informations. Cependant, lors de la planification, les […]

Read More
Information Quality (IQ) assurance and control for the BIM lifecycle data

Managing complex, fragmented, and high volume portfolios of data that are generated during the lifecycle of buildings poses major challenges for the Architecture, Engineering, Construction, and Operations (AECO) industry. Required information during the operation and maintenance phase of a building’s lifecycle is usually lost (or not transferred) at information handover stages, and extensive rework should […]

Read More
Utilization of Agile Management in Construction Projects

Usually, any construction project begins with the planning department preparing a construction schedule that is pushed onto the project team. The big up-front plan might cause delays in the construction process because it relies on predicting a lot in the future, so you need frequent updating of this plan throughout the execution. Agile is a […]

Read More
Quality Improvement of BIM for Operation and Maintenance phase

The use of Building Information Modeling (BIM) processes and technologies is rapidly growing in the Architecture, Engineering and Construction (AEC) industry. It is being widely implemented during the design and construction phases. However, the building models created in these phases are not suitable for the Operation and Maintenance Phase (O&M). These models lack useful data […]

Read More
Automated Risk Identification in Modular and Offsite Construction

Modular and offsite construction, where a module of project or complete house is manufactured in a factory, requires a large upfront capital (working capital) investment in order to procure materials in advance of manufacturing and to deliver modules on time and on schedule. Thus, modular fabricators need to receive deposit and progress payment before the […]

Read More
Productivity Tracking and Analysis of Earthmoving Operations

Monitoring and control earthmoving operations such as highways and dams construction; require the collection of large amounts of data. Collecting this data manually is time-consuming and it lacks accuracy, so there is a necessity for using automated data collection systems in such operations. Most of nowadays available data acquisition systems are costly back boxes, where […]

Read More
Towards Automation of 3D Visualization & Analysis of Workspace Collisions on Construction Jobsites

Workspace Interferences/Collisions happen on construction jobsites when multiple resources (labor, equipment, material, etc.) don’t have enough space to coexist at the same time and will interfere with each other’s operations. These interferences affect performance, delaying the project, impacting cost, and may jeopardize the buildings’ integrity and people’s safety on site. Most of existing models simulate […]

Read More