Conception des infrastructures de transport sur pergélisol instable

Les forces armees canadiennes sont appelees a consolider leur presence eta intensifier leurs operations dans le Nord canadien. La plupart de ces operations requierent des infrastructures (batiments, chemins et pistes d’atterrissage) et une grande capacite de mobilite terrestre. Les environnements pergelisoles qui caracterisent une grande proportion du territoire nordique Canadien sont potentiellement tres instables et […]

Read More
Innovative wastewater treatment flowsheet development for the high strength centrate from food waste processing facility

Centrate from food waste processing facilities contains higher concentrations of organic matters. Those contaminants (especially ammonia nitrogen) remain in the wastewater effluent after anaerobic digestion treatment, which are the great treat to the environment if not properly treated. Other contaminants (biochemical oxygen demand, chemical oxygen demand, total nitrogen, total phosphorus, suspended solids, etc.) also impact […]

Read More
Water Penetration of Brick Veneer Walls Made of Clay Bricks with Large Voids

Rain water penetration can cause severe damage to building materials and facilitates the growth of mould, endangering the health of the occupants of the building. This Mitacs project will determine the water penetration resistance of various clay brick veneers used in various buildings. This research will also provide very important test data that may allow […]

Read More
Evaluation and optimization of a mine water treatment system

Currently, mine water treatment systems within the Sydney Coalfield extract and treat mine water from depth with the aim to gradually ‘flush’ the mine pools of its acid-generating products and achieve good water quality over the long-term. However, since the deep, lower quality mine water is always being treated, significant annual operational costs (>$1 million) […]

Read More
Novel bioreactors for UV disinfection and resource recovery

Municipalities are facing significant challenges related to water treatment, including aging infrastructure, increasingly more stringent water quality limits (for drinking water) and discharge requirements (for wastewater), climate change and extreme weather events, constrained plant space, municipal budget stress, etc. Summer interns in this Mitacs project will be conducting research on novel bioreactors for UV disinfection […]

Read More
Volume Change Behaviour of Problematic Geomaterials

The proposed research consists of two tiers to understand the volume change behaviour of problematic geomaterials. Engineered structures have been distressed by expansive soils because of heaving and subsidence. Likewise, mine waste tailings from mineral beneficiation process must be contained in-pit storage facilities to minimize environmental impacts. This research is divided into investigation of volume […]

Read More
Integrating Digital Design + Prefabrication Processes into Calgary-based Architecture and Design Firms (continued)

Many architecture and design firms in Calgary have a strong desire to incorporate parametric software (BIM) and digital manufacturing (CAD-CAM) technologies into their design processes in order to meet evolving client demands, regulatory requirements, and sustainability performance targets. These are necessary criteria that constitute high-quality built environments capable of meeting the needs of multiple stakeholders […]

Read More
Towards Automation of 3D Visualization & Analysis of Workspace Collisions on Construction Jobsites

Workspace Interferences/Collisions happen on construction jobsites when multiple resources (labor, equipment, material, etc.) don’t have enough space to coexist at the same time and will interfere with each other’s operations. These interferences affect performance, delaying the project, impacting cost, and may jeopardize the buildings’ integrity and people’s safety on site. Most of existing models simulate […]

Read More
Productivity Tracking and Analysis of Earthmoving Operations

Monitoring and control earthmoving operations such as highways and dams construction; require the collection of large amounts of data. Collecting this data manually is time-consuming and it lacks accuracy, so there is a necessity for using automated data collection systems in such operations. Most of nowadays available data acquisition systems are costly back boxes, where […]

Read More
Automated Risk Identification in Modular and Offsite Construction

Modular and offsite construction, where a module of project or complete house is manufactured in a factory, requires a large upfront capital (working capital) investment in order to procure materials in advance of manufacturing and to deliver modules on time and on schedule. Thus, modular fabricators need to receive deposit and progress payment before the […]

Read More