Volume Change Behaviour of Problematic Geomaterials

The proposed research consists of two tiers to understand the volume change behaviour of problematic geomaterials. Engineered structures have been distressed by expansive soils because of heaving and subsidence. Likewise, mine waste tailings from mineral beneficiation process must be contained in-pit storage facilities to minimize environmental impacts. This research is divided into investigation of volume […]

Read More
Integrating Digital Design + Prefabrication Processes into Calgary-based Architecture and Design Firms (continued)

Many architecture and design firms in Calgary have a strong desire to incorporate parametric software (BIM) and digital manufacturing (CAD-CAM) technologies into their design processes in order to meet evolving client demands, regulatory requirements, and sustainability performance targets. These are necessary criteria that constitute high-quality built environments capable of meeting the needs of multiple stakeholders […]

Read More
Towards Automation of 3D Visualization & Analysis of Workspace Collisions on Construction Jobsites

Workspace Interferences/Collisions happen on construction jobsites when multiple resources (labor, equipment, material, etc.) don’t have enough space to coexist at the same time and will interfere with each other’s operations. These interferences affect performance, delaying the project, impacting cost, and may jeopardize the buildings’ integrity and people’s safety on site. Most of existing models simulate […]

Read More
Productivity Tracking and Analysis of Earthmoving Operations

Monitoring and control earthmoving operations such as highways and dams construction; require the collection of large amounts of data. Collecting this data manually is time-consuming and it lacks accuracy, so there is a necessity for using automated data collection systems in such operations. Most of nowadays available data acquisition systems are costly back boxes, where […]

Read More
Automated Risk Identification in Modular and Offsite Construction

Modular and offsite construction, where a module of project or complete house is manufactured in a factory, requires a large upfront capital (working capital) investment in order to procure materials in advance of manufacturing and to deliver modules on time and on schedule. Thus, modular fabricators need to receive deposit and progress payment before the […]

Read More
Onsite Monitoring and Progress Reporting

Construction projects are complex, unstructured and dynamic. So accurate project progress monitoring has always been an essential part of the project control plan and one of the main challenges for project managers. In fact in order to deliver projects on time and within budget, progress monitoring can be taken in to account as a critical […]

Read More
Utilization of Agile Management in Construction Projects

Usually, any construction project begins with the planning department preparing a construction schedule that is pushed onto the project team. The big up-front plan might cause delays in the construction process because it relies on predicting a lot in the future, so you need frequent updating of this plan throughout the execution. Agile is a […]

Read More
Quality Improvement of BIM for Operation and Maintenance phase

The use of Building Information Modeling (BIM) processes and technologies is rapidly growing in the Architecture, Engineering and Construction (AEC) industry. It is being widely implemented during the design and construction phases. However, the building models created in these phases are not suitable for the Operation and Maintenance Phase (O&M). These models lack useful data […]

Read More
Mise en place d’un processus de gestion des risques dans un departementde construction

L’objectif du projet est la création d’un processus de gestion des risques par l’étudiant, dans un service de conception et de construction d’aéroports, au sein de l’entreprise SNC Lavalin Construction. Ce processus devra être simple, facile d’utilisation, rigoureux et exhaustif. En effet, il vise à donner, à des personnes non sensibilisées à la gestion de […]

Read More
Paper-Based Weather Resistant Membrane for Building Applications

Currently, petroleum-based water resistance membranes are used in the construction industry in order to create a barrier against water. These make recycling a challenge during building demolition, as well as create a significant carbon footprint of their own. The purpose of this project is to develop a paper-based water barrier to replace the petroleum-based alternatives. […]

Read More